Siemens BTC-BR Manual Página 37

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 264
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 36
Technical Product Manual
Fault analysis and repairs 1318
2 Removing and fitting housing cover
Section 2: Removing and fitting housing cover • Edition 12/2005
TU00-1318-0200302 © Siemens VDO Trading GmbH Section 2 2–15
2.5.3 Clock hands
Procedure
Turn the second washer (6), minute hand (9) and hour hand (11) and remove
them by hand together with items (7), (8) and (10).
The ring (7) engages into the seconds plate (6).
Rings (4), (8) and (10) are engaged into the relevant indicator.
The rings prevent light escaping from the side.
2.5.4 Disengaging stop springs
Fig. 2-10 Disengaging stop springs
Procedure
Disengage the stop springs (1) in the direction of the arrow using a watchma-
ker's screwdriver.
1 Stop springs
1
1
Vista de página 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 263 264

Comentários a estes Manuais

Sem comentários