Frame Installation Instructions
Stationary, Moveable, and Fixed-Mounted Drawout Elements
Installing the Moveable Drawout Element
The outline drawings of the moveable drawout elements are
located in the Outline Dimension Drawings section starting on
page 36.
Carefully uncrate the moveable drawout element and remove
all packing material with the exception of the wire ties holding
the racking pump handle in place. Items such as a label for a
dead front shield and keys for the SB breaker with a key inter-
lock accessory may be taped to the top of the moveable
drawout element. If the moveable drawout element is secured
to a pallet, remove the securing device.
Preferred lifting arrangement.
Attach the lifting device accessory as illustrated. If lifting straps
are used instead of the lifting device accessory, the lifting
straps should go between the primary contacts. In either
arrangement, the moveable drawout element may be bal-
anced as it is being lifted by a crane or hoist. The moveable
drawout element should not be lifted by the primary contacts.
Pull out the extension rails on the stationary drawout element
until they hit a solid stop.
Lift by using the rear guide posts (one is located on left side
and one on right).
Lift the moveable drawout element over the extension rails.
For the 1200A and 2000A frame, align the moveable drawout
element so that the support brackets straddle the inside guide
rails, and carefully lower the moveable drawout element onto
the rail guides. For the 3200A and 5000A frame, align the
moveable drawout element so that the rollers straddle the
extension rails, and carefully lower the moveable drawout
element onto the extension rails. Remove the lifting device.
Remove the tie holding the racking pump handle.
Rollers and Rail