Siemens TL.. Instruções de Operação Página 53

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 61
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 52
Installation
4.3 Electrical installation
53
AC auxiliary power (self/external supply)
The SINVERT 350/420 inverters have a self-supply option (delivery state).
The jumpers on the terminal strip –OPT are set as shown.
With an external supply, the jumpers must be re-set at the terminal strip:
From terminal strip-OPT To terminal strip-OPT
101-102 102-103
104-105 105-106
107-108 108-109
110-111 111-112
Jumpers
Figure 4-13 Position of the terminal strip-OPT in the SINVERT 350/420
With external supply, connect the AC cable (3~ 400 V AC, neutral and PE) with the terminal strip –OPT:
L1 to 103
L2 to 106
L3 to 109
N to 112
PE to 113
Only external supply is possible in the SINVERT 500 TL.
External supply connector panel
Vista de página 52
1 2 ... 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Comentários a estes Manuais

Sem comentários