Installation
4.3 Electrical installation
47
4.3.2 External cable connections
The following cable connections should be made:
Table 4-1 External cable connections
Cable connection Cross-section
Tightening
torque
Screw type
DC input 4x2x95-300 mm
2
32 Nm M10
AC connection (L1, L2, L3, PEN) 3x2x240 mm
2
70 Nm M12
DC link (only for master/slave combination) 2x2x240 mm
2
70 Nm M12
Grounding min. 16 mm
2
25 Nm M8
AC auxiliary power supply (optional) 4 mm
2
0.5 Nm Terminal
Weather station (optional) 0.75 mm
2
0.5 Nm Terminal
RS422 (only for master/slave combination)
Connector
PROFIBUS
Connector
RJ45 for Ethernet communication (optional)
Connector
Do not pull on the leads or damage insulation when connecting cables or handling wires.
Strain relief is planned for the power cables.
Test all parts on receipt and ensure that neither the lead nor its insulation is damaged in handling and/or
storage.
WARNING
Testing cable insulation
Improperly laid or damaged cables and incorrectly attached cable shields can heat up in places and cause fires or short-
circuits wherever they make contact.
Ensure that cable shields are intact and replace all damaged parts.
Ensure that no short-circuit can occur on the power cables due to insulation damage resulting from incorrect
installation.