Industry Automation and Drive Technologies - SCE
TIA Training Document
Page 5 of 47 Module
E12
Status: 01/2010 Vision Sensor Shape Check with SIMATIC S7-300F 2PN/DP and VS120
1 PREFACE
Regarding its content, Module E12 is part of the instruction unit ’IT Communication with S7’.
Objective
In Module E12, the reader learns how networking and data exchange between PLCs and the vision
sensor evaluation device VS120 is set up.
As PLC, the CPU 315F-2 PN/DP and as vision sensor evaluation device the VS120 system for the
shape check are used. The SIMATIC VS120 components consist of an evaluation device with a
sensor head and an LED ring lamp. PROFINET is used for networking between the PLC and the
SIMATIC VS120.
Module E12 shows in principle the procedure for the startup, based on a brief example.
.
Prerequisites
To successfully work through Module E12, the following knowledge is assumed:
How to handle Windows
Fundamentals of PLC programming with Step7 (for example, Module A3 ‘Startup’ PLC
Programming with STEP7)
Fundamentals of network engineering (for example: Appendix V – Basics of Network
Engineering)
Fundamentals of
STEP7 Programming
2
to
3
days
Module
A
Industrial Fieldbus
Systems
2 to 3 days Modules
D
D
Additional Functions of
STEP7 Programming
2 to 3 days Modules B
Process
Visualization
2 to 3 days Modules F
Programming
Languages
2 to 3 days Modules
C
IT Communication
with SIMATIC S7
2 to 3 days Modules
E
System Simulation
with SIMIT SCE
1 to 2 days Modules G
Frequency Converter
at SIMATIC S7
2 to 3 days Modules H