Installation Instructions
July 30, 2008
WARNING: Open Processor/Protocol
2 or Controller Module - Lithium
Battery
Only qualified service personnel or an
authorized Siemens Building
Technologies, Inc. representative can
enable the Open Processor/Protocol 2 or
Controller Module lithium battery.
Improper installation of battery or use of
a different battery may cause an
explosion.
c. Power Open Processor/Ethernet or Power
Open Processor/BACnet, plug one end of
the RJ-45 cable into the Ethernet jack box,
and the other end into the corresponding
(right-hand) Power Open Processor port
labeled EALN.
d. For smoke control applications over
Etherne, You must connect to the Ethernet
ALN or BACnet/IP ALN through an Ethernet
switch UL Listed for Fire Signaling. The
panel and the switch must be installed in
the same room.
14. Enable the Power Open Processor/Open
Processor battery by removing the piece of
Mylar that separates the battery from its holder.
13. Discard the temporary connector cover.
15. Switch the MBC/RBC power switch ON.
The installation is now complete.
Figure 1. Temporary Cover with Pre-wired ALN and FLN Connectors Attached.
Figure 2. Installation of the Power Open Processor/Open Processor.