
Document No. 545-461
Installation Instructions
July 30, 2008
Prerequisites
• MBC or RBC mounted and AC power
connected.
• All wiring terminated.
• CE Compliance requirements met, if
needed.
• Power Module installed.
• Termination blocks installed, if any.
• Ethernet port installed, if any.
• Authorized modem installed if connection to
a public telephone network is required.
Depending on the type of installation, other
prerequisites may have to be completed.
For Installations Requiring CE Compliance
WARNING
This is a class A product. In a
domestic environment this
product may cause radio
interference, in which case the
user may be required to take
adequate measures.
Products intended for sale in the European
Economic Area (EEA) must bear the CE mark.
See APOGEE Wiring Guidelines for Field Panels
and Equipment Controllers (125-3002) for CE
compliance wiring requirements.
Installation
There are two options for installation:
• Installing a Power Open Processor/Open
Processor in a new MBC/RBC.
• Installing an additional Power Open
Processor/Open Processor in an existing
MBC/RBC.
Select the appropriate option for your installation.
Installing a Power Open Processor/Open
Processor in a New MBC/RBC
NOTE: Power Open Processors can be installed or
removed while the MBC/RBC is powered.
1. Switch the MBC/RBC power switch OFF.
NOTE: Insert or remove the Open Processor
only when the power switch is OFF.
2. Remove the temporary cover (card with
attached pre-wired ALN or FLN connectors) that
is wrapped around the mounting rails, M-Bus
rails, and C-Bus (See
Figure 1). Do not remove
the connectors at this time.
3. Remove the C-Bus cover from the lowest
available slot and discard (see
Figure 2).
4. Remove any remaining M-Bus protective tape
from the M-Bus rails (see
Figure 2).
5. If there is a warning label over the C-Bus card
on the back of the Power Open Processor/Open
Processor, remove it (see
Figure 4).
6. Remove the protective cap from the C-Bus card
edge (see
Figure 4).
7. Align the Power Open Processor/Open
Processor with the slot number printed on the
mounting rail (see
Figure 2).
8. Align the Power Open Processor/Open
Processor mounting guides with the right-hand
edge of the M-Bus rail (see
Figure 2).
9. Push firmly on the free end of the Open
Processor so that the C-Bus card edge and M-
Bus connector mate with the C-Bus connector
and M-Bus rail (see
Figure 2). You will hear a
“click” when the Power Open Processor/Open
Processor is properly attached to the mounting
rail.
10. If the Power Open Processor/Open Processor
needs repositioning, pull the metal latch. Pull the
Power Open Processor/Open Processor forward
from the C-Bus connector (see
Figure 2) and
repeat Steps 7 through 9.
11. Remove the pre-wired FLN connectors from the
temporary cover and plug them into the
corresponding ports on the left side of the Power
Open Processor/Open Processor. These ports
are labeled FLN 1, FLN 2, and FLN 3 (see
Figure 3). The screws for the connector should
be pointing down.
12. Do one of the following. If you are installing an:
a. Open Processor/Protocol 2, plug the ALN
connector into the corresponding port on
the right side labeled BLN + – S (see
Figure
4
). The screws for the connector should be
pointing down.
b. Power Open Processor/Protocol 2, plug the
ALN connector into the corresponding
(right-hand) port labeled BLN. The screws
for the connector should be pointing down.
Page 2 of 6 Siemens Building Technologies, Inc.
Comentários a estes Manuais