
Downloading
Configuring Hardware and Communication Connections with STEP 7
A5E00706939-01
14-5
14.3 Downloading the Network Configuration to a
Programmable Controller
Requirement
Here we shall assume that the entire project was already configured, meaning you
have:
• Configured all stations
• Created all subnets and set their properties
• Configured connections (if required)
• Set the PG/PC interface so that communication between the PG/PC and the
programmable controller is possible via the connected subnet.
• Checked the configuration for consistency
Only when a configuration is free of errors, meaning when all networked modules
in a subnet have unique node addresses and when their actual configuration
matches the network configuration you have created should you download the
configuration via the subnet (Industrial Ethernet, PROFIBUS or MPI) to the
programmable controllers.
Comentários a estes Manuais