
Siemens APOGEE™ FLN (P1) Communication Kit
MN04008002E
For more information visit:
www.EatonElectrical.com
3-7
February 2006
Table 3-4: Installing the OPTCB Communication Board, continued
Procedure Illustration
4. Make a sufficiently wide opening for your cable by cutting
the cover grid as wide as necessary.
5. Close the cover of the control unit and the cable cover.
Comentários a estes Manuais