2000591-001 Installation 27
AC Power (Mains) Connections, Continued
Step Action
7. Plug the connector back into its base and secure down with
the two recessed captive screws.
8. If using redundant power supplies repeat steps 6 and 7. If
not, use connecting wires to parallel connect to the other
power supply.
9.
Locate the ANG chassis ground lug
and connect wire
from it to the building’s ground connection.
10. Inspect all connections for shorts or loose connections.
11. You are now ready to connect the ADH and DataNET
channels; go to page 31.